In the progression of things we now were ready to remove the old support beam for the original small opening and put in a larger and longer beam to carry the larger opening and its roof load. To remove the old beam we had to support the ceiling/floor joist carrying the upper floor and the main roof load by building temporary support walls on each side of the beam. To get the old beam out we had to jack up both temporary walls to take off the roof load pressure so we could remove the old beam and then install the longer new beam. It was unbelievable how much more open the home felt with this larger opening from the kitchen to the family room.
