Kaufman Homes

Kaufman Homes has always aspired to go above and beyond any industry standards regarding warranties.

As a part of our commitment to excellence and our desire to always "do the right thing", Kaufman Homes has consistently fixed problems for our customers beyond our expressed (industry standard) 1 year limited warranty. Our long history of service and positive feedback from our many customers has given us the confidence in our workmanship, services, and what we build, to extend our present 1 year limited warranty to a 5 year limited warranty.

Thoughts From Kaufman Homes

Your unparalleled access to the thoughts of Dean Kaufman and the rest of Kaufman homes about home remodeling, home repair, and other trending topics in the residential construction field.

  • Home
    Home This is where you can find all the blog posts throughout the site.
  • Categories
    Categories Displays a list of categories from this blog.
  • Tags
    Tags Displays a list of tags that has been used in the blog.
  • Bloggers
    Bloggers Search for your favorite blogger from this site.
  • Team Blogs
    Team Blogs Find your favorite team blogs here.
  • Archives
    Archives Contains a list of blog posts that were created previously.
  • Login
01
Dec

Can you Remodel or Build a New Home in the Rain?

Posted by on in Home Remodeling
  • Font size: Larger Smaller
  • Hits: 36477
  • Print
  • PDF

In Salem, as well as most parts of Western Oregon, our weather is usually mild enough to allow certain remodeling projects and custom homes throughout the Fall and Winter without serious problems. In past years, Kaufman homes have begun many various size new homes, remodels and additions in October and November without significant problems. Ideally, if you can get the shell of the structure up and “dried-in” before mid-October, the remaining exterior work can dodge the storms, and the interior work can proceed unimpeded. If the roof must be removed, it is often easier to protect the house from snow than from Spring rains, since snow can be removed before melting.

When you start a Remodel or Custom Home is CRITICAL

Timing, however, is crucial. If a surprise storm brings a foot of wet snow or a week of sub-zero temperatures just after the basement or crawl space is excavated, you may incur costly delays or remedies in order to form and pour the foundation. On the other hand, the same storm an hour after the foundation is poured may be nothing more than a minor inconvenience.

Drying out a home or addition, once the roof is on is fairly easy with dehumidifiers, fans and a heat source.  Cold, windy weather also dries out a structure quickly.   Oregon building codes as of July 3, 2008 requires the moisture content prior to drywall to be no more than 19%.  No onsite inspection by the local building official is required but the building official must be notified of compliance by a written form using the state provided Moisture Content Acknowledgement Form at the bottom section of this link. We do not feel that 19% is sufficient so we test the moisture and have always been careful to take it down to 10-12% before insulating and dry walling.

Remodeling during the Holidays

Kaufman Homes is very sensitive about starting kitchen remodels, bath remodels and additions just before Thanksgiving because of the potential disruption to the family as kids may be home from school during Thanksgiving, Christmas and New Year’s. An exception could be the owner taking an extended vacation to warmer weather during this time or for that matter anytime during a remodel or addition.  Leaving during this process would make life much less stressful for the owner but this would require a high level of trust and confidence in your builder and may still require the owner to come back for short periods for their own well being and making special decisions. With the cell phone, computer photos and even Skype, leaving during this time is more possible than in past years.

Any increase in cost associated with weather protection or lost efficiency could easily be offset by the advantage of utilizing current prices of labor and materials, which may be lower in what is normally a slower construction time of year, locked in interest rates and finishing the project on schedule, instead of delaying for a spring start.

Please don't hesitate to schedule a meeting to discuss the process.  The design and estimating time frame will determine when construction can start.  For those of you who are weather sensitive or time sensitive, Kaufman Homes will schedule the design and estimating process  to allow a construction start with the better spring or summer weather, or whenever it is most convenient to your needs or commitments.   We are confident in providing the same high quality finished product, Kaufman Homes is known for, regardless of when construction is started or finished.

Comments

Welcome, Sign In To Comment

Categories

Custom Home
11 post(s)
Home Repair
8 post(s)
DIY Tips
6 post(s)
Design Ideas
3 post(s)

Most Popular Posts

Planning Countertop Heights for Kitchens and Bathrooms

When it comes to heights for bath, kitchen, utility countertops or dining surfaces, the heights should be based on the needs of the homeowner. Th

Kaufman's Home Maintenance: A Company Created to Serve You and Your Home

Dean and Duane Kaufman, owners of Kaufman Homes, are excited to announce we have developed and will be operating a new company called Kaufman’s Home

Preparing Your Home for Regular and Extended Vacations

Going away for a period of time means you are either leaving your home for a vacation or going on extended stay. Either way we all go with concerns
Kaufman Homes, Inc.
1295 Baxter Rd. SE, Salem, OR 97306
Tel: 503.370.8390
Fax: 503.370.2731
Download information as vCard
Kaufman Homes, Inc. - CCB# 55421
Kaufman Commercial LLC - CCB# 167901